CDA, PV System – Prefabrication and Installation. CHWS, CHWR, AHU, FCU and Chilled Beam piping- Prefabrication, Installation Piping

Posted by on Sep 15, 2010 in Portfolio | Comments Off on CDA, PV System – Prefabrication and Installation. CHWS, CHWR, AHU, FCU and Chilled Beam piping- Prefabrication, Installation Piping

CDA, PV System – Prefabrication and Installation.  CHWS, CHWR, AHU, FCU and Chilled Beam piping- Prefabrication, Installation Piping

Name of Client: Dai-Dan Co. Ltd
System Installed, Modification, Dismantle and Prefabrication: CDA System, PV System, CHWR/S piping, AHU Piping, FCU piping, Chilled Beam Hook Up
Year of installation: 2012
Location at Singapore: NUS-CREATE

Comments are closed.

スーパーコピー財布 スーパーコピー時計 スーパーコピーブランド cheap valentino cheap air jordans