Technics Steel

2016

  • Nursing Home- Fabrication 3D Frame

_____________________________________________________

International Paint

2015

  • Factory Expansion Project

_____________________________________________________________________

Techno Electrical Engineering

2015

  • Compressor Air Servicing and Distribution Pipe Setup Air Compressor System and Modify On Existing Distribution Loop

Heptagon

2016

  • Refurbish 3 Cleanrooms, Build New Warehouse, Office & Break Room
  • Cleanroom Additions Work: Hook Up; Modify Return Chaise Room; New Sub-Lateral
  • Renovation, Power Supply, Cooling Work, Fire Protection for FDR Room & HVAC Room
  • Supply Architectural Works and Building Works; ACMV System; FMCS System; Electrical & Instrumentation System; Fire Protection System; Process Utilities System; Mechanical Platform
  • Construction of FDR Room (Renvation, Power Supply, Cooling Work, Fire Protection)
  • Heptagon Woodlands – Level 5 Hook-Up Machine and A&A Works

2015

  • Heptagon Woodlands – Level 5 Barebone Cleanroom Class 10K Design, Construction Specifications & Requirements including M&E Hook-Up

2014

  • Turn Key project for Clean room(18000 sq. ft.) construction and Facilities System, DI, WWT, PV, ACMV, PCW, CDA and FMCS
  • Location: Singapore

2010 – 2013

  • RODI system maintenance and Servicing
  • Waste Water Treatment system PM
  • ACMV system PM
  • Process Vacuum system PM
  • Cooling Tower PM
  • Location: Singapore

Stats ChipPAC Pte Ltd

2016

  • Convert Tray Room to Class 100K cleanroom; Supply Electrical Work, ACMV System & Sprinkler System
  • Space Preparation for All Types of Equipment
  • Build Changing Room, IQA Lab, Spiral Room, Calibration Room & Office
  • QS Tester Aircon Improvement
  • Design and Build new General Exhaust System, Cold DI Main Line and Sub-Lateral, Concrete Wall & Floor Coring, Electrical Works
  • QP and Authorities Submission
  • Design and Build Class 100K Cleanroom (1300sqm) at 1A1F
  • Relocate Assembly Consolidation – Array EOL for Right Wing and Left Wing at 1A1F for Utilities Support
  • Relocate 1A1F CCTV into The Newly Constructed Security Room
  • Design and Build 4 sets of New Supports Structure to Replace Existing Supports for CHWS/R at 1A1F Class 100K Cleanroom during Conversion for Assembly

2015

  • Project to Provision 1B3F Pack room Expansion

2014-2015

  • To provide Total Solution to Enhance 1B2F Class 10K Clean Room

Shell PD

2011

  • E&I Contractor, under PEC Singapore for the Lubricating Production and Tank Farm
  • Location: Malaysia

Smitech

2010

  • Marina Barrage stainless steel piping replacement
  • 6-month project

Ultra Clean Technology

2010

  • Design and Build Clean room 10k, 100k, RO column System
  • 3-month project

Seagate Senai

2010

  • Grind Coolant System
  • 6-month project

Seagate (M) Limited

2008 – 2009

  • System designer for BCDS transfer and distribute system, 30%, 70% HNO3, Nickel Solution, Ammonia Hydroxide, IDOD coolant and Grind Coolant Mixing Station. These systems are supporting the production floor process, the Preparation line, the Plating line, the Grinding line and the Polishing line
  • 24-month project

Chartered Semiconductor

2010

  • Replacement of the RO skids with Polishing Mixed Bed
  • 12-month project

Titan

2007 – 2008

  • Terminal 2 BOG Compressor and support equipment, Electrical and Control System
  • 6-month project in Johor Bahru, Malaysia

2006 – 2007

  • Terminal 3 Tanks Facilities, Electrical and Control System, Tank System
  • 13-month project in Johor Bahru, Malaysia

ANDO Cooperation

2006 – 2008

  • Consulting Engineering Service – Process System for Seagate Substrate Project in Malaysia
  • ITB preparation, Tender Evaluation, Contractor Selection, SDC, QA/QC Services
  • 30-month project (Engineering Team Seconded Services)
  • Location: Singapore and Malaysia

Hewlett Packard Singapore Pte. Ltd.

2008

  • Newater System, Project Management
  • Consulting Engineering Service
  • ITB preparation, Tender Evaluation, Contractor Selection, SDC, QA/QC Services
  • 4-month project

2006

  • Design and Built a 50gpm UPDI system w/column and distribution loop
  • 3-month project

2005

  • Replacement of Activated Carbon Filter Vessels
  • 3-month project
  • Expansion of IJMS UPDI System, Primary and Polishing Mix Bed
  • ITB preparation, Tender Evaluation, Contractor Selection, SDC, QA/QC Services
  • 3-month project

2004 – 2005

  • UPDI system, Acid Waste Treatment System
  • 8-month project

2004

  • Dust Collection System, Scrubber system, SCADA and PLC upgrade
  • ITB preparation, Tender Evaluation, Contractor Selection, SDC, QA/QC Services
  • Location: Singapore

2003-2004

  • Warehouse / Office / Clean-room , Class 1000 Conversion, AHU Design and Distribution
  • ITB preparation, Tender Evaluation, Contractor Selection, SDC, QA/QC Services
  • 6-month project

2002 – 2003

  • Warehouse / Office / Clean-room , Class 1000 Conversion, AHU Design and Distribution
  • 6-month project

2002

  • Compressed Air and Process Vacuum System
  • 4-month project

2000 – 2001

  • Ultra Pure Water, Acid Waste Water Treatment, Waste Concentrated Acid Collection System and Waste Solvent System
  • 8-month project

2000

  • Acid Scrubber System
  • 6-month project
  • Waste Water Reclaim for Cooling Tower and Scrubber
  • 8-month project

Micron Singapore

2007

  • UPDI system
  • 8-month project